Audit the sources
Identify usable material, missing elements, rights, and technical constraints.
DOC N.I.L. / Editing + Post-Production
Footage, photographs, graphics, and sound from different suppliers often arrive with mismatched formats and no shared editorial direction.
BUILD AROUND YOUR BRIEF
Scope to agree: Source footage, running time, number of edits, review rounds, finishing requirements, and final exports determine the scope.
Bring existing assets into a consistent campaign or brand story.
Source-asset assessment and editorial plan
Approved main edit or finishing package
Scoped picture and sound treatment
Version manifest and final exports
A source-and-version map exposes format and rights gaps before they are embedded in the final delivery schedule.
Identify usable material, missing elements, rights, and technical constraints.
Resolve the main story, finishing approach, and version hierarchy.
Complete the scoped treatment and check the delivery outputs.
The rate-card scope factors are shown below. Client complexity is applied separately.
One defined editorial project using an organized existing asset set.
An expanded release with more source types and delivery versions.
A complex campaign library with multiple contributors, technical formats, and approval groups.
A planning range using the same rate card as the full DOC N.I.L. calculator.
Check continuity, technical conformance, approved content, and completeness of the final version manifest.
A company can combine interviews, product footage, and supplied graphics into a release that feels like one production.
The proposal confirms quantities, review rounds, locations, versions, and the service period. Additional work receives a written change scope before it starts.
8% G&A is additional. Third-party costs and applicable tax are confirmed separately. Estimates are planning ranges, not a booking or a guarantee of results.
The rate is per project. One defined editorial project using an organized existing asset set. The proposal fixes quantities, schedules, review rounds, and delivery specifications before work begins.
New filming, complex visual effects, and replacement assets are separate. Music, stock, and external licensing are separate. Source reconstruction and additional revisions require separate scope. Any change outside the approved scope is priced before it proceeds.
ONE BRIEF. ONE CONNECTED COMPANY.
This can be one focused project or part of a complete campaign. DOC N.I.L. brings strategy, creative, talent, production, websites, and media together through one point of contact.
Straight answers about The Campaign Edit Suite.
A typical project is $3,500–$7,500 (USD / project · base planning fee). Focused scope. Local business. Before an 8% general and administrative (G&A) fee, tax, suppliers, talent, and licensed usage. Your final price depends on your business and scope, and is confirmed in a written proposal before work begins.
Source-asset assessment and editorial plan; Approved main edit or finishing package; Scoped picture and sound treatment; Version manifest and final exports.
Original media and existing project files; Approved story, brand assets, and rights information; Required version list and technical delivery specifications.
1. Audit the sources 2. Build the editorial system 3. Finish and verify One DOC N.I.L. contact coordinates the work from kickoff to delivery.
Send a short brief through our contact page or call 864-918-3709. We review it with you, then agree scope, milestones and investment in a written proposal before work begins.